题目内容
(请给出正确答案)
[主观题]
A logger planned to work from 6 AM t0 4 PM with 30 minutes for lunch. If the skidder spent 30 minute
s waiting for trees to be felled, 45 minutes replacing a hydraulic fitting, and 20 minutes moving to another landing, total payload is 300m3.
查看答案
如果结果不匹配,请 联系老师 获取答案